Window schedule or floor plan
Send us the list of openings with dimensions, or the project drawings: we work directly from that, instead of re-measuring from scratch on every contact.
We supply and install PVC and aluminium windows for construction and renovation projects in Lisbon, Greater Lisbon and Setúbal, with written timelines and company invoicing.
Timelines agreed in writing.
Manufacturing in 2-4 weeks, company invoicing with a NIF, and direct coordination with your team on site.
Send window schedule →What site supervision and the spec sheet usually ask for, answered up front.
| Profiles | VEKA · Rehau · Kömmerling · Deceuninck — Class A PVC, 5-7 chambers |
|---|---|
| Hardware | Roto · Maco, multi-point locking |
| Glass | Double Low-E as standard; acoustic or triple specified opening by opening |
| Uw | Confirmed per opening in the quote, always below the legal limit for the zone (I1: 2.80 W/m²·°C) |
| Certification | CE marking to EN 14351-1; DoP (Declaration of Performance) available for every system supplied |
| Lead times | White 2-4 weeks; colours and anthracite typically 6-8 weeks |
| Installation | Phased by work fronts, coordinated with the project schedule; company invoicing with a NIF |
Send us the list of openings with dimensions, or the project drawings: we work directly from that, instead of re-measuring from scratch on every contact.
Frame profile, number of chambers, glass type, security rating (RC), colour. If it isn't defined yet, we help finalise the spec based on the project.
Tell us the date you need the windows installed by, not just "as soon as possible". We fit manufacturing and installation into the real construction schedule.
Company NIF (Portuguese tax number) and address, so the invoice is correct from the quote stage, no back-and-forth over paperwork once the job is closed.
Fill it in once, with the window schedule attached if you have it. No need to trade messages just to gather the details.
We always give you the real manufacturing timeline (typically 2-4 weeks after the spec is confirmed) and the installation date, in writing, before you commit. We'd rather give an honest timeline we can meet than an optimistic promise that delays the next trade on site.
Yes. Ask for the invoice to be issued to the company or the project owner, with the correct NIF (Portuguese tax number) from the initial quote. It avoids rework in the accounts afterwards.
Yes, it's the most efficient format for us too: it avoids back-and-forth confirming measurements one by one. If the project doesn't have final measurements yet, we do the on-site survey before locking in manufacturing.
We agree the installation window directly with you or the site foreman, to avoid clashing with other crews (plastering, painting). Installation itself is usually completed in one day per unit or flat.
The per-unit price tends to improve with volume. Send the window schedule and we'll give you one figure for the whole project, not an isolated unit price.
That happens often on site. We'll flag immediately if a change affects the timeline already agreed, so you can manage that with the rest of the team ahead of time, not at the last minute.
Reach us on WhatsApp or by phone, no form needed.
Cookies, with your consent
We use cookies necessary for the site to work. With your permission only, we also use analytics and marketing cookies (e.g. Google) to measure and improve our ads. You can accept, reject or choose. Cookie policy.